QC check on a part inside the machine between operations

Quality at Fenva

Every part measured. Every reading on record.

We check parts after every operation as they are made, inspect every drawing feature before they ship, and send you the actual readings in a Final Inspection Report with every order.

ISO 9001:2015IATF 16949:2016AS9100D · EN 9100:2018 Certificates (PDF)

Our QC process

How a part is checked, from raw material to shipment

Five checkpoints on every order, each measured against your drawing.

  1. STEP 01 / 05

    Incoming material

    Certified raw material is checked on arrival for grade, specification and condition before it reaches the floor, and its certificate stays with your order.

    Racks of aluminium bar stock
  2. STEP 02 / 05

    First article

    After every setup, the first piece is measured against your drawing before the batch continues.

    Operator at a part clamped in the vise of a machining centre
  3. STEP 03 / 05

    After every operation

    Our QC team checks the parts after every operation, before they move to the next one. A mobile check station also walks the floor, pulling parts for unannounced sample checks while operations are running.

  4. STEP 04 / 05

    Final inspection

    Every drawing feature is ballooned and measured on sampled pieces in our temperature-stable lab. Standard sampling, included in every price: fewer than 5 pcs, every piece; 5–99 pcs, 5 pieces; 100–499 pcs, 5%; 500–1,499 pcs, 3%; 1,500–4,999 pcs, 1%; 5,000 pcs or more, 0.5% (always rounded up). Inspection beyond this plan is available on request at extra cost.

    CMM probe measuring a machined aluminium ring held in a vise
  5. STEP 05 / 05

    Release

    The verdict is computed from the readings against your tolerance. A part number with any out-of-tolerance reading is held until it is resolved.

    Machined aluminium rings in foam trays, with the part drawing

Good to know

  • A part number with any out-of-tolerance reading is held until it is resolved.
  • Out-of-tolerance readings are recorded on the report, never overwritten.
  • Instruments recorded on our reports: 3D CMM, 2.5D VMM, calipers, micrometers, height gauge, thread plug & ring gauges, pin gauges.

Your print is the spec, not a suggestion.

Before shipment you receive photos of your parts and the inspection report. Nonconforming parts are remade at our cost.

A batch of turned aluminium rings in its own Fengfan bin

Part traceability

Every batch carries a bin number through every operation

Each batch has its own numbered bin, so every reading traces back to its batch and operation.

Bin no.OP10 · OP20 · OP30Final report
Learn more
Certified aluminium bar stock

Material traceability

Raw material arrives with its mill test certificate

All raw material arrives with an MTC (mill test certificate) and stays traceable: it is stored in our material bins, then issued to the machine for machining.

MTC on arrivalMaterial binIssued to machine
Learn more

The Final Inspection Report

What you receive with every part number

Your own drawing, every feature numbered, and the measured value for each sampled piece. As a PDF for your records and as an interactive inspection map.

Interactive inspection map: ballooned part drawing beside the results table, with a hovered balloon showing measured values for each sampled piece
Interactive inspection map: hover a balloon to see that feature’s requirement, limits and readings.
  1. 1Ballooned drawing. Every feature on your print is numbered and traced to its measurement.
  2. 2Actual readings. A value for each sampled piece, not a checkbox.
  3. 3Instrument per feature. You can see how each value was measured.
  4. 4Pass / fail against your tolerance. Features you mark as critical are flagged throughout.
Final inspection report PDF, page 1: inspection details and the ballooned drawing
PDF report: ballooned drawing and inspection summary
Final inspection report PDF, results table with readings for five sampled pieces
Results table: readings for each sampled piece

In every order’s QC package

  • Final Inspection Report (PDF, English / Chinese)
  • Interactive inspection map
  • Photos of your finished parts

On request

  • EN 10204 3.1 material certificates
  • First-article and CMM reports
  • APQP / PPAP / SPC

Continuous improvement

What changes after we find a problem

Most issues are caught during machining and fixed in-house before parts ship. Every order makes the next one run better.

Caught during machining

Any out-of-tolerance reading stays on the report, never overwritten.

  1. Found in machining or inspection
  2. Reworked or replaced
  3. Program, sequence or method fixed
  4. Parts ship to your drawing

Every repeat order

Each run starts from what the last one taught us.

  1. Your repeat order
  2. Same inspection plan + run notes
  3. Faster runs, shorter lead time
  4. Better, more consistent parts

If an issue reaches you

Rare, and fixed at the root, not just on the part.

  1. Your feedback
  2. Team meeting · root cause
  3. Resolution plan agreed
  4. Optimized before your next batch

Inspection lab

Parts on the CMM, away from the machines

Final inspection runs in a temperature-stable lab, separate from the production floor: CMM for 3D geometry and GD&T, VMM for fine 2D features and edges.

CMM probe measuring a machined aluminium ring held in a vise
CMM probe on a turned aluminium part
Bridge CMM with a part fixtured on the granite table
Part fixtured on the granite table
Inspector running a CMM measurement program
Inspector running the measurement
Machined part on the VMM glass stage
VMM for fine 2D features
Height gauge on the granite surface plate
Height gauge on the surface plate

Certifications and sample documents

All manufacturing runs inside Fengfan’s certified quality management system.

Certificate details, as printed on each certificate
StandardCertification bodyCertificate no.Valid untilScope
ISO 9001:2015Excellence Xinshidai Certification Co., Ltd. (ZYXQC)26424Q30291R2S2027-10-16Machine parts processing; electrical installation of printed circuit boards
IATF 16949:2016Quality Austria Certification GmbHT7-17195/0 (IATF 0566106)2028-02-18Mechanical processing of metal parts and electrical assembly of printed circuit boards (without product design)
AS9100D · EN 9100:2018Quality Austria Certification GmbHAS7-00110/02029-05-19Mechanical processing of metal parts (EN 9100:2018 without product design, technically equivalent to AS 9100D)

As printed on the certificates: the ISO 9001 certificate can be checked at www.zyxqc.com.cn or www.cnca.gov.cn, and the IATF 16949 certificate at www.cnca.gov.cn.

Fenva Precision is the international division of Suzhou Fengfan Electronics Technology Co., Ltd. All manufacturing is performed within Fengfan’s certified facilities and quality management system; the certifications fully apply to Fenva Precision.

Customer feedback

What customers wrote after delivery

Really good quality parts, and 10/10 for the packing. The clevis parts are a real quality job and measure up fine.
Post-delivery email, CNC machined clevis parts. Has since reordered across several part families.
Product distributor, United Kingdom
Everything looks great and the coordination was smooth. We didn't think any parts needed to be remade. Thanks again for the quick turnaround.
Post-delivery email on a machined parts order.
Design studio, Germany

Quotes are taken from customer emails after delivery, lightly trimmed and never rewritten. To protect customer confidentiality we publish role and region only.

Inspector running a CMM measurement program

Factory-direct pricing

Cut the markup, not the accountability.

You're talking to the factory, not a broker.

You deal with the factory that machines and inspects your parts.

  • The same contact from quote to delivery, no hand-offs
  • FAI and CMM/VMM reports; sampling plan published
  • DDP to the US, UK and Europe on qualifying orders
Foam-packed CNC parts with inspection paperwork, ready for shipment

Get started

Quality you can document, on every order.

Send your drawings and our engineering team will quote within 48 hours, with the inspection and documentation your program needs.

NDA on request, signed before you share files.