Ordering process
Simple, efficient ordering from China.
Eight clear steps from your first file to delivery at your door, with quotes in 48 hours, engineering support and full traceability along the way.
Step by step
From files to delivery, in eight steps
Typical lead times are shown so you can plan. Your project manager keeps you updated at each stage.
Submit your files
Send 3D and 2D files with material, finish and quantity. For the most accurate quote, send both a 3D STEP and a 2D PDF with tolerances: 3D only is machined to ISO 2768-m general tolerance, 2D only is priced as an estimate until we receive the model. Files are kept confidential; NDA on request.
Specify requirements
Confirm quantity, material, tolerances and finishes. We can quote multiple options on request.
Review quotation
within 48 hYou receive a detailed, line-item quote with lead time, typically within 48 hours. Have a target price? Include it — quotes converge faster, and if it’s within reach we’ll often just meet it.
Engineering support & DFM
1–3 daysDFM feedback on geometry, tolerances and material to cut cost and risk before machining begins.
Confirm & lock in lead time
Quotes are valid for 30 days; lead time starts on deposit. We confirm the schedule with you.
Sampling & approval
~10 business daysOn request, we produce samples for your approval. Samples are charged separately, typically about ten business days.
Manufacturing
Material traceability, precision machining, in-process QC, finishing and packaging, with progress updates throughout.
Shipping & logistics
Protective packaging and worldwide shipment by air, rail or sea, DDP available for selected destinations.
Inside production
What steps 7 and 8 look like on the floor

Machining, under coolant and control
During manufacturing, the spindle head and way covers run a coolant-flooded pass, holding tolerance while in-process QC checks dimensions against the drawing.
Finished, bagged and staged for shipping
Before step 8, finished anodised components are individually bagged and staged on the rack for final inspection and protective packaging, ready for worldwide shipment.

Shipping & logistics
Choose the speed that fits your program
Transit times are typical ranges and vary by destination and customs. We'll confirm options and cost with your quote.
| Method | Transit time | Notes |
|---|---|---|
| Air freight | 7–12 days | Fastest option |
| Railway | 25–35 days | Asia & Europe |
| Sea freight | 39–65 days | Most economical |
| DDP | On request | Available for selected destinations |
DDP (Delivered Duty Paid) means we handle freight, duties and customs to your door where available.

Get started
Ready to start your order?
Send your drawings and our engineering team will quote within 48 hours, no minimum order.
Your drawings stay confidential.